OpenShift Modify the Scheduler Policy: Difference between revisions

From NovaOrdis Knowledge Base
Jump to navigation Jump to search
No edit summary
 
(One intermediate revision by the same user not shown)
Line 11: Line 11:
1. Get the current scheduling policy in force, for reference. The current scheduling policy can be obtained as described here: [[OpenShift_Concepts#Scheduler_Policy|Scheduler Policy]].
1. Get the current scheduling policy in force, for reference. The current scheduling policy can be obtained as described here: [[OpenShift_Concepts#Scheduler_Policy|Scheduler Policy]].


1. Edit the existing scheduler configuration file [[/etc/origin/master/scheduler.json]].
2. Edit the existing scheduler configuration file [[/etc/origin/master/scheduler.json]].


2. Restart the master services on all master nodes.
3. Restart the master services on all master nodes following this procedure:


Get the new policy, and make sure it differs from the old policy obtained at step 1. The current scheduling policy can be obtained as described here: [[OpenShift_Concepts#Scheduler_Policy|Scheduler Policy]].
{{Internal|OpenShift_Runtime#Restart_Across_a_HA_Cluster|Restart across a HA Cluster}}
 
4. Get the new policy, and make sure it differs from the old policy obtained at step 1. The current scheduling policy can be obtained as described here: [[OpenShift_Concepts#Scheduler_Policy|Scheduler Policy]].

Latest revision as of 03:43, 17 October 2017

Internal

Overview

This article describes the procedure to modify the default scheduler policy.

Procedure

1. Get the current scheduling policy in force, for reference. The current scheduling policy can be obtained as described here: Scheduler Policy.

2. Edit the existing scheduler configuration file /etc/origin/master/scheduler.json.

3. Restart the master services on all master nodes following this procedure:

Restart across a HA Cluster

4. Get the new policy, and make sure it differs from the old policy obtained at step 1. The current scheduling policy can be obtained as described here: Scheduler Policy.